Search

How can we help?

Icon

Battle of the rights – Landlord’s right to build vs the tenant’s right to quiet enjoyment

It is commonplace for a landlord who fully owns a commercial property to part rent it out and then to reserve a right in the lease enabling them to develop the remainder of the property. However, would the landlord be completely free to do so?

This question was answered in Timothy Taylor Ltd v Mayfair House Corporation [2016] EWHC 1075 which reminded landlords to be cautious not to categorically assume an unchallengeable right to develop the remainder of a building without taking into account the concerns of existing tenants.

The tenant operated a high class art gallery from the ground floor and basement of a five storey building in Mayfair, London. The lease contained clauses entitling the landlord to carry out development works to other parts of the building, and in particular to erect scaffolding. Against this, the lease also contained a clause permitting the tenant to peaceably and quietly enjoy the premises.

When the landlord began works to develop the upper floors of the building in 2013, the works produced high levels of noise and the scaffolding enveloped the whole building. This rendered the gallery virtually invisible, giving the impression that it was closed and formed part of the building site. This soon led to a claim from the tenant against the landlord.

There was an acute conflict between the landlord’s and the tenant’s respective rights under the lease. The Court found that despite the landlord’s express right to redevelop adjoining premises under the terms of the lease, with some disruption, the manner in which the landlord had been undertaking its redevelopment works exceeded this right and was in breach of the covenant for quiet enjoyment.

In particular, the Court found that the design of the landlord’s scaffolding and its failure to consult or provide sufficient information to enable to gallery to plan around the noise were unreasonable.

The judge took particular note of the quality of the premises and their location and the high rent payable and the fact that the landlord was undertaking the works for its own benefit rather than simply seeking to comply with any repairing obligation or other duty to the tenant.

In particular, the Court found that the design of the landlord’s scaffolding and its failure to consult or provide sufficient information to enable to gallery to plan around the noise were unreasonable.

This decision highlights some practical points and factors that a landlord should consider when taking reasonable steps to minimise disturbance to a tenant. A landlord should:

  • Give the tenant as much information as possible about any proposed works before the lease is granted; Meet with the tenant at an early stage to explain the works and discuss how disturbances can be minimised including noise limits and quiet periods;
  • Ensure that any specific requirements agreed between the Landlord and tenant are passed on to, and implemented by, the contractor and project managers – including regular meetings with the tenant;
  • Design the scaffolding and make delivery and unloading arrangements that do not obstruct any access points of the tenant’s premises and try to ensure that signage is kept visible; and
  • Ensure that the tenant is kept updated as to the length of the works and any conditions in the lease relating to the right to carry out works are complied with.

For further information on landlord/tenant rights, please contact our Real Estate legal team.

Disclaimer

This information is for guidance purposes only and should not be regarded as a substitute for taking legal advice. Please refer to the full General Notices on our website.

Author profile

About this article

Read, listen and watch our latest insights

art
  • 18 August 2026
  • Immigration

Home Office curtailment of Sponsored Workers’ permission: Why employers and employees must act quickly

The Home Office has recently changed the speed at which it processes sponsor notifications following the end of a sponsored worker’s employment.

art
  • 13 August 2026
  • Employment

ACAS Draft New Code on Disciplinary and Grievance Procedures

ACAS have published a draft Code on 30 July 2026, which will replace the 2015 ACAS Code on disciplinary and grievance procedures when the Code is finalised at the end of September 2026.

art
  • 12 August 2026
  • Corporate and M&A

EMIs – April 2026 changes explained

On 6 April 2026 the Enterprise Management Incentive scheme (EMI) was expanded to make EMIs accessible to a wider range of businesses.

art
  • 06 August 2026
  • Privacy and Data Protection

The rise of the AI-powered individual: Is your business ready?

Artificial intelligence is changing the data protection landscape, but perhaps not in the way many organisations expected. Much of the discussion has centred on businesses adopting AI and ensuring they comply with the UK GDPR.

Pub
  • 06 August 2026
  • Employment

Employment law changes in 2026: What you need to know

With ongoing changes to UK employment law, staying updated is more challenging than ever. Join Monica Atwal and Harry Berryman for a live webinar covering 2026 HR changes and key employment law updates on Thursday 17 September.

Pub
  • 04 August 2026
  • Employment

From Opportunity to Employment: Building Inclusive Workplaces Together | Hosted by Breakthrough Supported Employment

Join Breakthrough Supported Employment for a live seminar on building inclusive workplaces at Malmaison Reading. Clarkslegal’s Lucy White will speak alongside industry experts, sharing insights on fostering diversity and creating equitable opportunities.